Bikaner
Commercial and Industrial Solar in Bikaner

Why Solar in Bikaner
DISCOM. Bikaner offers very high solar irradiance with growing food processing and agriculture sector demand. Government campuses and industrial sheds are prime candidates for 100 kWp and above systems.
Local Project Delivery
SolarMaxx has delivered commercial and industrial solar projects across Bikaner and surrounding industrial belts. Our Jaipur engineering team handles site survey, DISCOM filing, installation, and long-term O&M for plants in the region.
Project Delivery
1. Site Survey
Roof structural assessment, shadow analysis, and load data review.
2. Design and DPR
System sizing, single-line diagram, and savings model for your board.
3. Install and Commission
Turnkey EPC with DISCOM metering arrangements and grid synchronisation.
4. Monitor and Maintain
Live generation tracking and preventive O&M from our Jaipur team.

4.5 MW Solar Power Plant, Gajner, Bikaner
SolarMaxx commissioned a 4.5 megawatt solar power project at Gajner, Bikaner under captive consumption model, one of the largest utility-scale projects delivered by SolarMaxx in Rajasthan.
4.5 MW System Size
View Case StudyRegional Solar Requirements
SolarMaxx handles DISCOM metering approvals that supports the documentation and approval process required to connect your commercial solar system to the grid.
A typical rooftop solar project of around 100 kWp to 500 kWp commercial solar installation takes 8 to 12 weeks from the initial site survey to final commissioning.
18+ Years
Of C&I solar EPC experience
600+ Rooftop Sites
Delivered across India
Call 0141 4009995. Response within 1 business day.