Bikaner

Commercial and Industrial Solar in Bikaner

4.5 MW solar power plant at Gajner, Bikaner
Local Context

Why Solar in Bikaner

6.2 hrs
Peak Sun Hours Daily
DISCOM
Local DISCOM
Rs 8.2/unit
Avg Commercial Tariff

DISCOM. Bikaner offers very high solar irradiance with growing food processing and agriculture sector demand. Government campuses and industrial sheds are prime candidates for 100 kWp and above systems.

SolarMaxx

Local Project Delivery

SolarMaxx has delivered commercial and industrial solar projects across Bikaner and surrounding industrial belts. Our Jaipur engineering team handles site survey, DISCOM filing, installation, and long-term O&M for plants in the region.

Process

Project Delivery

1. Site Survey

Roof structural assessment, shadow analysis, and load data review.

2. Design and DPR

System sizing, single-line diagram, and savings model for your board.

3. Install and Commission

Turnkey EPC with DISCOM metering arrangements and grid synchronisation.

4. Monitor and Maintain

Live generation tracking and preventive O&M from our Jaipur team.

Featured Project Nearby
4.5 MW ground-mounted solar power plant at Gajner, Bikaner

4.5 MW Solar Power Plant, Gajner, Bikaner

SolarMaxx commissioned a 4.5 megawatt solar power project at Gajner, Bikaner under captive consumption model, one of the largest utility-scale projects delivered by SolarMaxx in Rajasthan.

4.5 MW System Size

View Case Study
Common Questions

Regional Solar Requirements

SolarMaxx handles DISCOM metering approvals that supports the documentation and approval process required to connect your commercial solar system to the grid.

A typical rooftop solar project of around 100 kWp to 500 kWp commercial solar installation takes 8 to 12 weeks from the initial site survey to final commissioning.

View all FAQs →

18+ Years

Of C&I solar EPC experience

600+ Rooftop Sites

Delivered across India

Talk to a Solar Engineer

Call 0141 4009995. Response within 1 business day.

Free Assessment

Request a Site Assessment