Delhi

Commercial and Industrial Solar in Delhi

Commercial solar panel installation, Delhi NCR
Local Context

Why Solar in Delhi

5.2 hrs
Peak Sun Hours Daily
DISCOM
Local DISCOM
Rs 10/unit
Avg Commercial Tariff

DISCOM. Delhi carries among the highest commercial tariffs in India. Metering (net or gross, as applicable) is permitted up to 1 MW on eligible connections. Industrial estates in Okhla, Narela, and Bawana are actively adopting rooftop solar to offset demand charges.

SolarMaxx

Local Project Delivery

SolarMaxx has delivered commercial and industrial solar projects across Delhi and surrounding industrial belts. Our Jaipur engineering team handles site survey, DISCOM filing, installation, and long-term O&M for plants in the region.

Process

Project Delivery

1. Site Survey

Roof structural assessment, shadow analysis, and load data review.

2. Design and DPR

System sizing, single-line diagram, and savings model for your board.

3. Install and Commission

Turnkey EPC with DISCOM metering arrangements and grid synchronisation.

4. Monitor and Maintain

Live generation tracking and preventive O&M from our Jaipur team.

Local Insight

Local Solar Market

Delhi commercial establishments face some of India's highest electricity tariffs under DISCOM. SolarMaxx has delivered rooftop and carport installations for commercial office buildings, automobile dealerships, and institutional clients across Delhi through full DISCOM documentation support.

Featured Project
Rooftop solar at Sitapura, Jaipur, 710 kW

Sitapura, Jaipur - 710 kW

See how we've delivered projects like this one. Sitapura, Jaipur - 710 kW is a rooftop solar plant at an automotive and bearing components facility, with net metering and about Rs. 80 lakh in annual savings.

710 kW Capacity

Read Case Study
Common Questions

Regional Solar Requirements

SolarMaxx handles DISCOM metering approvals that supports the documentation and approval process required to connect your commercial solar system to the grid.

A typical rooftop solar project of around 100 kWp to 500 kWp commercial solar installation takes 8 to 12 weeks from the initial site survey to final commissioning.

View all FAQs →

18+ Years

Of C&I solar EPC experience

600+ Rooftop Sites

Delivered across India

Talk to a Solar Engineer

Call 0141 4009995. Response within 1 business day.

Free Assessment

Request a Site Assessment